GTAC Observation Log 1. Date : 06/11/2011 2. Observation Sr. No. : 5611 3. Observer : Subhashis Roy 4. Observer's Email : roy@ncra.tifr.res.in 5. Project Name : A Monitoring Program for Transient Radio Sources near the Galactic Center 6. Project Code : 21_065 7. Operator(s) : Nilesh, Rupsingh, Santaji, Shilpa 8. Command File : /odisk/gtac/cmd/roy/gc.var.src.04nov11 9. LTA File : /gsbifrdata/06nov/21_065_06nov2011.lta 10. LogFlag File : /odisk/online1/logflags/21_065.FLAGS.3 ANTENNA SETTINGS : 11. RF Band(MHz) & Solar Attn(dB)- RF1 : 306 MHz ,RF2 : 306 MHz, SA1 : 14 dB, SA2 : 14 dB 12. Ist LO (MHz) & IVth LO (MHz): ILO1 : 255 MHz, ILO2 : 255 MHz , IVLO1 : 51 MHz, IVLO2 : 51 MHz 13. IF Attn(dB) , IF BW(MHz) & IF ALC : IF-CH1 : 24+4 dB, 32 MHz,OFF, IF-CH2 : 24+4 dB, 32 MHz,OFF GSB SETTINGS : 14. GSB Mode : RealTime 15. GSB LTA : 8 16. GAIN EQ : OFF 17. Stokes : Full_Polar 18. Beam - 1 : OFF 19. Beam - 2 : OFF 20. ACQ BW : 32 MHz 21. Maximum Channels : 256 22. IFBW (MHz) : LO5 (KHz) : 32:149000-156000 23. Final Bandwidth (MHz): OFF MHz; Step # 0 24. Frequency Parameters (TPA) : 306 306 255 255 51 51. 25. Integration Time : 16.106 Sec. 26. No of Antennas Working(Fringing) :26 27. Name of Non-Working Antennas (with reason for each) : C14 : For painting. S06 : Feed jam. W04 : 175pol no fringe. S02 : For painting. 28. Note for Backup :-- 29. Start and End Time of Obs.(IST): 13:30 - 18:00 30. ONLINE Machine : Lenyadri 31. Comments (During Observations) : 13:30 : Started settings. 14:05 : Power equilised on G0.0+0 @ 450counts. Halted GSB and shifted to Gain Eq. on, full_stokes, 32MHz, 256channels. 14:12 : '/odisk/gtac/cmd/roy/gc.var.src.04nov11' command file started. 14:43 : S02 started working. 17:23 : Stopped command file. 17:25 : Started power Eq on 1714-252 @ 400 counts. 17:32 : Started scan on 1714-252. 17:40 : Stopped scan. 17:47 : Started scan on 3c48. 18:00 : Stopped observation session.