GTAC Observation Log 1. Date : 29/12/2012 2. Observation Sr. No. : 6296 3. Observer : Ruta Kale 4. Observer's Email : rkale@ira.inaf.it,ruta.kale@gmail.com 5. Project Name : Low frequency follow-up of the first radio halo in a Planck cluster 6. Project Code : 23_010 7. Operator(s) : Pramod, Rupsingh, Sachin, Surender 8. Command File : /odisk/gtac/cmd/ruta/23_010/dec29.cmd 9. LTA File : /gsbifrdata/29dec/23_010_29dec2012.lta 10. LogFlag File : /odisk/online1/logflags/23_010.FLAGS ANTENNA SETTINGS : 11. RF Band(MHz) & Solar Attn(dB)- RF1 : 629 MHz ,RF2 : 253 MHz, SA1 : 0 dB, SA2 : 14 dB 12. Ist LO (MHz) & IVth LO (MHz): ILO1 : 680 MHz, ILO2 : 304 MHz , IVLO1 : 51 MHz, IVLO2 : 51 MHz 13. IF Attn(dB) , IF BW(MHz) & IF ALC : IF-CH1 : 4+12 dB, 32 MHz,ON, IF-CH2 : 4+12 dB, 32 MHz,ON GSB SETTINGS : 14. GSB Mode : RealTime 15. GSB LTA : 8 16. GAIN EQ : ON 17. Stokes : Total_Intensity 18. Beam - 1 : OFF 19. Beam - 2 : OFF 20. ACQ BW : 32 MHz 21. Maximum Channels : 256 22. IFBW (MHz) : LO5 (KHz) : 32:149000-156000 23. Final Bandwidth (MHz): OFF MHz; Step # 0 24. Frequency Parameters (TPA) : 629 253 680 304 51 51. 25. Integration Time : 16.106 Sec. 26. No of Antennas Working(Fringing) :27 27. Name of Non-Working Antennas (with reason for each) : W05 : MECH maintenance. S01 : BLDC C03 : Taken by visitor. 28. Note for Backup :-- 29. Start and End Time of Obs.(IST): 17:02 - 02:00 30. ONLINE Machine : Lenyadri 31. Comments (During Observations) : 17:50 : Started settings. 17:57 : Started scan on 3C48. 18:10 : Stopped scan. 18:21 : C02 started working. 18:15 : Started command file '/odisk/gtac/cmd/ruta/23_010/dec29.cmd' 03:35 : Stopped command file. 03:39 : Started scan on 3C147. 04:00 : Stopped scan and closed observation session.