GTAC Observation Log 1. Date : 05/1/2013 2. Observation Sr. No. : 6308 3. Observer : Ruta Kale 4. Observer's Email : rkale@ira.inaf.it,ruta.kale@gmail.com 5. Project Name : Low Frequency follow-up of the first radio halo in a planck clus ter. 6. Project Code : 23_010 7. Operator(s) : Rupsingh, Surender 8. Command File : /odisk/gtac/cmd/ruta/23_010/5jan13.cmd 9. LTA File : /gsbifrdata/05jan/23_010_05jan2013.lta 10. LogFlag File : /odisk/online1/logflags/23_010.FLAGS.1 ANTENNA SETTINGS : 11. RF Band(MHz) & Solar Attn(dB)- RF1 : 306 MHz ,RF2 : 306 MHz, SA1 : 0 dB, SA2 : 0 dB 12. Ist LO (MHz) & IVth LO (MHz): ILO1 : 255 MHz, ILO2 : 255 MHz , IVLO1 : 51 MHz, IVLO2 : 51 MHz 13. IF Attn(dB) , IF BW(MHz) & IF ALC : IF-CH1 : 10+12 dB, 32 MHz,ON, IF-CH2 : 10+12 dB, 32 MHz,ON GSB SETTINGS : 14. GSB Mode : RealTime 15. GSB LTA : 8 16. GAIN EQ : ON 17. Stokes : Total_Intensity 18. Beam - 1 : OFF 19. Beam - 2 : OFF 20. ACQ BW : 32 MHz 21. Maximum Channels : 256 22. IFBW (MHz) : LO5 (KHz) : 32:149000-156000 23. Final Bandwidth (MHz): OFF MHz; Step # 0 24. Frequency Parameters (TPA) : 306 306 255 255 51 51. 25. Integration Time : 16.106 Sec. 26. No of Antennas Working(Fringing) :26 27. Name of Non-Working Antennas (with reason for each) : C12 : Servo problem. W05 : Mech Maintenance. S01 : BLDC work. C08 : Painting. 28. Note for Backup :-- 29. Start and End Time of Obs.(IST): 15:50 - 00:00 30. ONLINE Machine : Lenyadri 31. Comments (During Observations) : 15:50 : Started setting for 23_010. 15:58 : Started scan on 3C48. 16:09 : Stopped scan. 16:10 : Started command file'/odisk/gtac/cmd/ruta/23_010/5jan13.cmd' 18:15 : C08 released for observation. 23:41 : Stopped command file. 23:45 : Started scan on 3C48. 00:00 : Stopped scan & observation session over.