GTAC Observation Log 1. Date : 03/06/2014 2. Observation Sr. No. : 7142 3. Observer : Ramesh Bhat,Poonam Chandra 4. Observer's Email : ramesh.bhat@curtin.edu.au,poonam@ncra.tifr.res.in 5. Project Name : Further follow-up observations of Fast Radio Burst 140514 with the GMRT 6. Project Code : ddtB128 7. Operator(s) : Manisha,Nilesh, 8. Command File : /odisk/gtac/cmd/poonam/3june2014/obs.cmd 9. LTA File : /gsbifrdata/03jun/ddtb128_03jun2014.lta, 10. LogFlag File : /odisk/online1/logflags/DDTB128.FLAGS, ANTENNA SETTINGS : 11. RF Band(MHz) & Solar Attn(dB)- RF1 : 1371 MHz ,RF2 : 1371 MHz, SA1 : 0 dB, SA2 : 0 dB 12. Ist LO (MHz) & IVth LO (MHz): ILO1 : 1320 MHz, ILO2 : 1320 MHz , IVLO1 : 51 MHz, IVLO2 : 51 MHz 13. IF Attn(dB) , IF BW(MHz) & IF ALC : IF-CH1 : 4+12 dB, 32 MHz,ON, IF-CH2 : 4+12 dB, 32 MHz,ON GSB SETTINGS : 14. GSB Mode : Realtime 15. GSB LTA : 8 16. GSB CTRL : ONLINE 17. GSB Fstop : ON 18. GAIN EQ : ON 19. Stokes : TotIntensity 20. Beam - 1 : OFF 21. Beam - 2 : OFF 22. ACQ BW : 33.33 MHz 23. Final BW : 33.333333 MHz; Step # 0 24. Maximum Channels : 256 25. Channel Numbers : 0:255:1 26. LO5 -1 : 149.00 27. LO5 -2 : 156.00 28. Frequency Parameters (TPA) : 1371 1371 1320 1320 51 51. 29. Integration Time : 8.053056 Sec. 30. No of Antennas Working(Fringing) at the begining :27 31. Name of Non-Working Antennas (with reason for each) : C04 : Servo Problem. W06 : Maintenance (servo BLDC work). S02 : Maintenance (FPS off). 32. Note for Backup : 33. Start and End Time of Obs.(IST): 06:20 - 09:50 34. ONLINE Machine : Shivneri 35. No of Antennas Working(Fringing) at the end :27 36. Comments (During Observations) : 06:26 : Started scan on 3c286 for ~10min. 06:43 : Started command file. 07:44 : E03 released for painting work. 09:30 : stopped command file. 09:35 : started scan on 3C48 ~15mins. 09:50 : stopped das & observation session.