GTAC Observation Log 1. Date : 09/11/2014 2. Observation Sr. No. : 7416 3. Observer : Jayanta Roy, Bhaswati Bhattacharyya, Yashwant Gupta, Dipankar Bhattacharya 4. Observer's Email : jayanta.roy@manchester.ac.uk, bhaswati.bhattacharyya@manchester.ac.uk, ygupta@ncra.tifr.res.in, dipankar@iucaa.ernet.in 5. Project Name : Long-term timing program for millisecond pulsars discovered by the GMRT in Fermi-directed searches 6. Project Code : 27_041 7. Operator(s) : Nilesh, Rupsing, Surender 8. Command File : /odisk/gtac/cmd/jroy/27_041_9nov.1.cmd,/odisk/gtac/cmd/jroy/27_041_9nov.2.cmd, 9. LTA File : /gsbifrdata/09nov/27_041_09nov2014_2s.lta,/gsbifrdata/09nov/27_041_09nov2014.lta.1,/gsbifrdata/09nov/27_041_09nov2014.lta 10. LogFlag File : /odisk/online1/logflags/27_041.FLAGS.5,/odisk/online1/logflags/27_041.FLAGS.4,/odisk/online1/logflags/27_041.FLAGS.3 ANTENNA SETTINGS : 11. RF Band(MHz) & Solar Attn(dB)- RF1 : 306 MHz ,RF2 : 306 MHz, SA1 : 0 dB, SA2 : 0 dB 12. Ist LO (MHz) & IVth LO (MHz): ILO1 : 255 MHz, ILO2 : 255MHz , IVLO1 : 51 MHz, IVLO2 : 51 MHz 13. IF Attn(dB) , IF BW(MHz) & IF ALC : IF-CH1 : 24+4 dB, 32 MHz,OFF, IF-CH2 : 24+3 dB, 32 MHz,OFF GSB SETTINGS : 14. GSB Host : gsbm1 15. GSB Mode : Realtime 16. GSB LTA : 8 17. GSB CTRL : ONLINE 18. GSB Fstop : ON 19. GAIN EQ : OFF 20. Stokes : Total_Intensity 21. Beam - 1 : IA 22. Beam - 2 : OFF 23. ACQ BW : 33.333333 MHz 24. Final BW : 33.333333 MHz; Step # 25. Maximum Channels : 512 26. Channel Numbers : 0:511:1 27. LO5 -1 : 149 28. LO5 -2 : 156 29. Frequency Parameters (TPA) : 306 306 255 255 51 51 30. Integration Time : 16.1061 Sec 31. No of Antennas Working(Fringing) at the beginning :26 32. Name of Non-Working Antennas (with reason for each) : C04 : RFI ripples. E06 : BLDc. W06 : Strong RFI line. S04 : LO1 unlock. C01 : Taken for feed cage painting. 33. Note for Backup : 34. Start and End Time of Obs.(IST): 09 Nov 2014 05:00:00 - 09 Nov 2014 12:05:00 35. ONLINE Machine : Shivneri 36. No of Antennas Working(Fringing) at the end :26 37. Comments (During Observations) : 05:20 : Power eq. on 0837-198 05:21 : Started command file. '/odisk/gtac/cmd/jroy/27_041_9nov.1.cmd' 06:17 : Stopped command file. -------------------------------------------------------------------------- 06:20 : Setup IA and PA 06:33 : Power and phasing on 1154-350. 06:36 : Started command file /odisk/gtac/cmd/jroy/27_041_9nov.2.cmd' 12:00 : Stopped command file and observing session is over. 08:15 : Stopped command file, and started feed rotation to 610 MHz. 08:15 : C04 Started working and C01 Taken for feed cage painting. 08:32 : Started command file for poiting. 09:15 : Pointing updated and started power eq on 1154-350. 09:35 : Phasing done on 1154-350. 09:39 : Started command file. '/odisk/gtac/cmd/jroy/27_041_9nov.3.cmd'. 12:00 : Stopped command file and observing session is over.