GTAC Observation Log 1. Date : 08/02/2015 2. Observation Sr. No. : 7597 3. Observer : Paula Benaglia, C.H. IshwaraChandra 4. Observer's Email : pbenaglia@fcaglp.unlp.edu.ar, ishwar@ncra.tifr.res.in 5. Project Name : A deep investigation of the Cygnus region at decimeter wavelengths 6. Project Code : 27_036 7. Operator(s) : Deepak, Nilesh, Pramod, Rupsing 8. Command File : /odisk/gtac/cmd/27_036/feb8.cmd 9. LTA File : /gsbifrdata/08feb/27_036_8feb2015.lta,/gsbifrdata/08feb/27_036_08feb2015.lta,/gsbifrdata1/08feb/27_036_08feb2015.lta 10. LogFlag File : /odisk/online1/logflags/27_036.FLAGS.6 ANTENNA SETTINGS : 11. RF Band(MHz) & Solar Attn(dB)- RF1 : 306 MHz ,RF2 : 306 MHz, SA1 : 0 dB, SA2 : 0 dB 12. Ist LO (MHz) & IVth LO (MHz): ILO1 : 255 MHz, ILO2 : 255MHz , IVLO1 : 51 MHz, IVLO2 : 51 MHz 13. IF Attn(dB) , IF BW(MHz) & IF ALC : IF-CH1 : 4+12 dB, 32 MHz,ON, IF-CH2 : 4+12 dB, 32 MHz,ON GSB SETTINGS : 14. GSB Host : gsbm1 15. GSB Mode : Realtime 16. GSB LTA : 8 17. GSB CTRL : ONLINE 18. GSB Fstop : ON 19. GAIN EQ : ON 20. Stokes : Total_Intensity 21. Beam - 1 : OFF 22. Beam - 2 : OFF 23. ACQ BW : 33.333333 MHz 24. Final BW : 33.333333 MHz; Step # 25. Maximum Channels : 256 26. Channel Numbers : 0:255:1 27. LO5 -1 : 149 28. LO5 -2 : 156 29. Frequency Parameters (TPA) : 306 306 255 255 51 51 30. Integration Time : 8.053 Sec 31. No of Antennas Working(Fringing) at the beginning :28 32. Name of Non-Working Antennas (with reason for each) : C03 : Gear box replacement. W06 : 130 pole no fringe 33. Note for Backup : 34. Start and End Time of Obs.(IST): 08 Feb 2015 11:00:00 - 08 Feb 2015 18:00:00 35. ONLINE Machine : Lenyadri 36. No of Antennas Working(Fringing) at the end :28 37. Comments (During Observations) : 10:50 : Started set up. 11:03 : Started scan on 3C468.1. 11:14 : Stopped scan and started command file. '/odisk/gtac/cmd/27_036/feb8.cmd' 14:00 : Less number of records observed in .lta file.(.lta file was recording data by 12.3 sec instead of 8 sec.).Hence halt the GSB. After reboot to all nodes and gsbm1 machine problem get solved. 14:48 : C10 applied both brakes. 15:13 : Started new .lta file -------------------------------------------------------------------------- 15:15 : S01,E03 and C10 no fringe. -------------------------------------------------------------------------- 15:25 : S-arm power fail. 15:40 : S-arm started working. -------------------------------------------------------------------------- 15:41 : S01 Started working. -------------------------------------------------------------------------- 16:20 : E03 started working. 17:07 : C10 started working. -------------------------------------------------------------------------- 17:15 : Stopped command file due to source set. 17:17 : Started scan on phase cal. 17:23 : Stopped scan. 17:26 : Started scan on 3C48. 17:41 : Stopped scan and observation closed.