GTAC Observation Log 1. Date : 24/07/2015 2. Observation Sr. No. : 7939 3. Observer : Mayuresh Surnis, BHAL CHANDRA JOSHI, Maura Ann McLaughlin, Periasamy K. Manoharan, Krishnakumar MA 4. Observer's Email : mpsurnis@ncra.tifr.res.in, bcj@ncra.tifr.res.in, maura.mclaughlin@mail.wvu.edu, mano@ncra.tifr.res.in, kkma@ncra.tifr.res.in 5. Project Name : Follow-up Timing of Four Pulsars Discovered with the GMRT 6. Project Code : 28_024 7. Operator(s) : Sachin 8. Command File : /odisk/gtac/cmd/mpsurnis/28_024.cmd 9. LTA File : /gsbifrdata1/24jul/28_024_24jul15.lta 10. LogFlag File : /odisk/online1/logflags/28_024.FLAGS.11 ANTENNA SETTINGS : 11. RF Band(MHz) & Solar Attn(dB)- RF1 : 591 MHz ,RF2 : 591 MHz, SA1 : 0 dB, SA2 : 0 dB 12. Ist LO (MHz) & IVth LO (MHz): ILO1 : 540 MHz, ILO2 : 540MHz , IVLO1 : 51 MHz, IVLO2 : 51 MHz 13. IF Attn(dB) , IF BW(MHz) & IF ALC : IF-CH1 : 4+14 dB, 32 MHz,ON, IF-CH2 : 4+14 dB, 32 MHz,ON GSB SETTINGS : 14. GSB Host : gsbm1 15. GSB Mode : Realtime 16. GSB LTA : 8 17. GSB CTRL : ONLINE 18. GSB Fstop : ON 19. GAIN EQ : ON 20. Stokes : Total_Intensity 21. Beam - 1 : PA 22. Beam - 2 : PA 23. ACQ BW : 33.333333 MHz 24. Final BW : 33.333333 MHz; Step # 25. Maximum Channels : 512 26. Channel Numbers : 0:511:1 27. LO5 -1 : 149 28. LO5 -2 : 156 29. Frequency Parameters (TPA) : 591 591 540 540 51 51 30. Integration Time : 16.1061 Sec 31. No of Antennas Working(Fringing) at the beginning :30 32. Name of Non-Working Antennas (with reason for each) : 33. Note for Backup : 34. Start and End Time of Obs.(IST): 24 Jul 2015 01:00:00 - 24 Jul 2015 04:00:00 35. ONLINE Machine : Shivneri 36. No of Antennas Working(Fringing) at the end :30 37. Comments (During Observations) : 00:15 : Started setup. 00:30 : Started power eq on 1822-096. 00:45 : Restarted GSB with GAin on. 00:50 : Started phasing. 01:00 : Started cmd file. /odisk/gtac/cmd/mpsurnis/28_024.cmd 03:20 : Observation session over. 01:00 : Done setup and started command file. 03:20 : Stopped command file and closed observation session.