GTAC Observation Log 1. Date : 29/02/2016 2. Observation Sr. No. : 8447 3. Observer : Emmanouil Papastergis, Elizabeth A.K. Adams, J.M. vanderHulst, Riccardo Giovanelli, Martha P Haynes, Jayaram Narayanan Chengalur, Gregory Hallenbeck 4. Observer's Email : papastergis@astro.rug.nl, betsey@astro.cornell.edu, vdhulst@astro.rug.nl, riccardo@astro.cornell.edu, haynes@astro.cornell.edu, chengalur@ncra.tifr.res.in, ghallenbeck@astro.cornell.edu 5. Project Name : An accurate measurement of the Baryonic Tully-Fisher Relation with very gas-dominated galaxies 6. Project Code : 29_057 7. Operator(s) : Navnath, Nilesh, Pramod, Shilpa, Surender 8. Command File : /odisk/gtac/cmd/29_029/obs_21hrs.cmd 9. LTA File : /gsbifrdata1/28feb/29_057_28feb2016.lta.1, /gsbifrdata1/28feb/29_057_28feb2016.lta, /gsbifrdata1/29feb/29_057_29feb2016.lta 10. LogFlag File : /odisk/online1/logflags/29_057.FLAGS.1 ANTENNA SETTINGS : 11. RF Band(MHz) & Solar Attn(dB)- RF1 : 1386.1835 MHz ,RF2 : 1386.1835 MHz, SA1 : 0 dB, SA2 : 0 dB 12. Ist LO (MHz) & IVth LO (MHz): ILO1 : 1325 MHz, ILO2 : 1325MHz , IVLO1 : 61.1835 MHz, IVLO2 : 61.1835 MHz 13. IF Attn(dB) , IF BW(MHz) & IF ALC : IF-CH1 : 4+14 dB, 16 MHz,ON, IF-CH2 : 4+14 dB, 16 MHz,ON GSB SETTINGS : 14. GSB Host : gsbm1_lenyadri 15. GSB Mode : Realtime 16. GSB LTA : 8 17. GSB CTRL : ONLINE 18. GSB Fstop : ON 19. GAIN EQ : ON 20. Stokes : Total_Intensity 21. Beam - 1 : OFF 22. Beam - 2 : OFF 23. ACQ BW : 16.666666 MHz 24. Final BW : 4 MHz; Step # 8 25. Maximum Channels : 512 26. Channel Numbers : 0:511:1 27. LO5 -1 : 138.8165 28. LO5 -2 : 166.1835 29. Frequency Parameters (TPA) : 1386.1835 1386.1835 1325 1325 61.1835 61.1835 30. Integration Time : 8.053 Sec 31. No of Antennas Working(Fringing) at the beginning :26 32. Name of Non-Working Antennas (with reason for each) : C02 : : RFI. C06 : : MCM 14 Time out(feed jam). C08 : : BLDC work E05 : : CST Paniting. 33. Note for Backup : 34. Start and End Time of Obs.(IST): 28 Feb 2016 21:00:00 - 29 Feb 2016 09:05:00 35. ONLINE Machine : Lenyadri 36. No of Antennas Working(Fringing) at the end :26 37. Comments (During Observations) : 21:00 : Started setup. 21:25 : Started scan on 3C147 for 10 min. 21:46 : Started command file. '/odisk/gtac/cmd/29_029/obs_21hrs.cmd' 02:40 : Stopped command file. 02:45 : Started scan on 3C286. 03:00 : Stopped scan. ----------------------------------------------------- 03:00 : Started following set-up. GSB line observation setup RF band= 1390 (1330 - 1450) LO1= 1340 (lower) IFBW= 18 GSB [ACQ] BW= 16.6666 Total Channel= 512 Line/Center Frequency= 1411.5 CH#[0]= 1409.4167 CH#[256]= 1411.5 CH#[512]= 1413.5833 BW= +4.1666 CW= 8.14 (KHz.) step#= 2 is USEABLE ### GSB_CONFIG LO5= 138.9165 166.0835 LTA_FILE L05= 130.5833 174.4167 BASE BAND LO4= 61.0835 61.0835 online tpa 1401.0835 1401.0835 1340 1340 61.0835 61.0835 ------------------------------------------------------------ 03:12 : Started scan on 3C286. 03:28 : Started command file. "/odisk/gtac/cmd/29_057/29feb16/obs_29feb_03hrs.cmd" 08:42 : Stopped command file. 08:47 : Started scan on 3C468.1. 09:05 : Stopped scan and observing session over.