GTAC Observation Log 1. Date : 06/11/2016 2. Observation Sr. No. : 8969 3. Observer : Leon Oostrum, Joeri vanLeeuwen, Yogesh Maan 4. Observer's Email : l.c.oostrum@uva.nl, leeuwen@astron.nl, maan@astron.nl 5. Project Name : Confirming the first pulsar around a subluminous B dwarf 6. Project Code : 31_012 7. Operator(s) : Surender 8. Command File : /odisk/gtac/cmd 9. LTA File : /gsbifrdata/06nov/31_012_06nov2016.lta.1, /gsbifrdata/06nov/31_012_06nov2016.lta, /gwbifrdata1/06nov/u31_012_06nov2016_gwb.lta.1, /gwbifrdata1/06nov/u31_012_06nov2016_gwb.lta 10. LogFlag File : /odisk/online1/logflags/31_012.FLAGS.1 ANTENNA SETTINGS : 11. RF Band(MHz) & Solar Attn(dB)- RF1 : 306 MHz ,RF2 : 306 MHz, SA1 : 0 dB, SA2 : 0 dB 12. Ist LO (MHz) & IVth LO (MHz): ILO1 : 255 MHz, ILO2 : 255MHz , IVLO1 : 51 MHz, IVLO2 : 51 MHz 13. IF Attn(dB) , IF BW(MHz) & IF ALC : IF-CH1 : 4+14 dB, 32 MHz,ON, IF-CH2 : 4+14 dB, 32 MHz,ON GSB SETTINGS : 14. GSB Host : gsbm1_shivneri 15. GSB Mode : Realtime 16. GSB LTA : 8 17. GSB CTRL : ONLINE 18. GSB Fstop : ON 19. GAIN EQ : ON 20. Stokes : Total_Intensity 21. Beam - 1 : OFF 22. Beam - 2 : OFF 23. ACQ BW : 33.333333 MHz 24. Final BW : 0 MHz; Step # 0 25. Maximum Channels : 256 26. Channel Numbers : 0:255:1 27. LO5 -1 : 149 28. LO5 -2 : 156 29. Frequency Parameters (TPA) : 306 306 255 255 51 51 30. Integration Time : 16.1061 Sec 31. No of Antennas Working(Fringing) at the beginning :30 32. Name of Non-Working Antennas (with reason for each) : 33. Note for Backup : 34. Start and End Time of Obs.(IST): 06 Nov 2016 00:00:00 - 06 Nov 2016 05:38:00 35. ONLINE Machine : Lenyadri 36. No of Antennas Working(Fringing) at the end :30 37. Comments (During Observations) : GWB connected antennas : All Central square (except C14 ) + E02 + S01 +W01 -------------------------------------------------------------------------- GWB-GAC Selection : All CSQ (except C14 ) + E02 + S01 +W01 (Total 16 antennas) -------------------------------------------------------------------------- GWB BW-200MHz, No of Channels-2048, Integration factor (No. of fft)-16 Total intensity, Beam1 -IA & Beam2-PA , GAB LO-500MHz ,LPF-200MHz. --------------------------------------------------------------------- 23:30 : Started set-up. 00:01 : Power eq and phasing done on 3C48. 00:11 : phasing done on 0521-207. 00:15 : Started off-on-off scan on 0521-207. 00:24 : Started scan on J0437-4715 for ~ 6.44244 min. 00:35 : Started scan on HE0532-4503 for ~ 92.6101 min. 02:09 : Started scan on J0437-4715 for ~ 2.41592 min. 02:13 : Started scan on 0521-207 for ~ 6.71088 min. 02:22 : Started scan on J0437-4715 for ~ 1.87905 min. 02:25 : C12 Removed from GAC due to servo problem. 02:25 : Started scan on J0437-4715 for ~ 1.34218 min. 02:28 : Started scan on HE0532-4503 for ~ 93.147 min. 04:02 : Started scan on J0437-4715 for ~ 1.07374 min. 04:05 : Started scan on 0521-207 for ~ 1.87905 min. 04:10 : Started scan on J0437-4715 for ~ 0.805306 min. 04:11 : Started scan on HE0532-4503 for ~ 86.973 min. 05:38 : Stopped scan and observing session is over.