GTAC Observation Log 1. Date : 13/09/2017 2. Observation Sr. No. : 9747 3. Observer : Joseph Karl Swiggum, Megan DeCesar, Kevin Stovall, David Kaplan, Ingrid Stairs, Scott M. Ransom, Mallory Roberts, Joeri vanLeeuwen, Yogesh Maan, Maura Ann McLaughlin, Jason WilliamThomas Hessels, Victoria Kaspi 4. Observer's Email : swiggumj@uwm.edu, megandecesar@gmail.com, stovall.kevin@gmail.com, kaplan@uwm.edu, stairs@astro.ubc.ca, sransom@nrao.edu, malloryr@gmail.com, leeuwen@astron.nl, maan@astron.nl, maura.mclaughlin@mail.wvu.edu, hessels@astron.nl, vkaspi@physics.mcgill.ca 5. Project Name : Localization and Timing of 34 Pulsars Discovered in the GBNCC Survey 6. Project Code : 32_075 7. Operator(s) : Navnath, Sachin 8. Command File : /odisk/gtac/cmd/32_075/13sep2017/obs.cmd 9. LTA File : /gsbifrdata1/13sep/32_075_13sep2017.lta 10. LogFlag File : /odisk/online1/logflags/32_075.FLAGS.28 ANTENNA SETTINGS : 11. RF Band(MHz) & Solar Attn(dB)- RF1 : 591 MHz ,RF2 : 591 MHz, SA1 : 0 dB, SA2 : 0 dB 12. Ist LO (MHz) & IVth LO (MHz): ILO1 : 540 MHz, ILO2 : 540MHz , IVLO1 : 51 MHz, IVLO2 : 51 MHz 13. IF Attn(dB) , IF BW(MHz) & IF ALC : IF-CH1 : 24+24 dB, 32 MHz,OFF, IF-CH2 : 4+14 dB, 32 MHz,OFF GSB SETTINGS : 14. GSB Host : gsbm1_shivneri 15. GSB Mode : Realtime 16. GSB LTA : 8 17. GSB CTRL : ONLINE 18. GSB Fstop : ON 19. GAIN EQ : ON 20. Stokes : Total_Intensity 21. Beam - 1 : OFF 22. Beam - 2 : OFF 23. ACQ BW : 33.333333 MHz 24. Final BW : 0 MHz; Step # 0 25. Maximum Channels : 256 26. Channel Numbers : 0:255:1 27. LO5 -1 : 149 28. LO5 -2 : 156 29. Frequency Parameters (TPA) : 591 591 540 540 51 51 30. Integration Time : 16.1061 Sec 31. No of Antennas Working(Fringing) at the beginning :27 32. Name of Non-Working Antennas (with reason for each) : C06 : : All mcm time out. W01 : : Maintenance S04 : : Elevation Brake. 33. Note for Backup : 34. Start and End Time of Obs.(IST): 13 Sep 2017 07:30:00 - 13 Sep 2017 09:30:00 35. ONLINE Machine : Shivneri 36. No of Antennas Working(Fringing) at the end :27 37. Comments (During Observations) : 07:35 : Started setup. 07:45:00 : Started power eq. 07:50:00 : Phasing done. 08:00:53 : Started scan on 3C48 for ~ 5.10027 min. 08:12:56 : Started scan on J0405+33 for ~ 11.2743 min. 08:27:36 : Started scan on J0509+38 for ~ 11.0058 min. 08:45:35 : Started scan on J1017-15 for ~ 10.7374 min. 09:08:18 : Started scan on J1110+58 for ~ 11.0058 min. 09:21:06 : Started scan on 0739+703 for ~ 6.44244 min. 09:30 : Observation session over. ==========================================================