GTAC Observation Log 1. Date : 04/12/2017 2. Observation Sr. No. : 9924 3. Observer : Elizabeth A.K. Adams, Luke Leisman, Aaron Romanowsky, Steven Janowiecki, John Michael Cannon, Emmanouil Papastergis, Gyula I.G. Józsa 4. Observer's Email : adams@astron.nl, leisman@astro.cornell.edu, aaron.romanowsky@sjsu.edu, steven.janowiecki@icrar.org, jcannon@macalester.edu, papastergis@astro.rug.nl, gigjozsast@gmail.com 5. Project Name : The fundamental properties of field ultra-diffuse galaxies 6. Project Code : 33_023 7. Operator(s) : Pramod, Rupsing 8. Command File : /odisk/gtac/cmd/33_023/04dec17/obs_block7.cmd 9. LTA File : /gsbifrdata1/04dec/33_023_04dec2017.lta 10. LogFlag File : /odisk/online1/logflags/33_023.FLAGS.8 ANTENNA SETTINGS : 11. RF Band(MHz) & Solar Attn(dB)- RF1 : 1377.3501 MHz ,RF2 : 1377.3501 MHz, SA1 : 0 dB, SA2 : 0 dB 12. Ist LO (MHz) & IVth LO (MHz): ILO1 : 1315 MHz, ILO2 : 1315MHz , IVLO1 : 62.3501 MHz, IVLO2 : 62.3501 MHz 13. IF Attn(dB) , IF BW(MHz) & IF ALC : IF-CH1 : 4+12 dB, 16 MHz,ON, IF-CH2 : 4+12 dB, 16 MHz,ON GSB SETTINGS : 14. GSB Host : gsbm1_shivneri 15. GSB Mode : Realtime 16. GSB LTA : 8 17. GSB CTRL : ONLINE 18. GSB Fstop : ON 19. GAIN EQ : ON 20. Stokes : Total_Intensity 21. Beam - 1 : OFF 22. Beam - 2 : OFF 23. ACQ BW : 16.666666 MHz 24. Final BW : 4 MHz; Step # 1 25. Maximum Channels : 512 26. Channel Numbers : 0:511:1 27. LO5 -1 : 137.6499 28. LO5 -2 : 167.3501 29. Frequency Parameters (TPA) : 1377.3501 1377.3501 1315 1315 62.3501 62.3501 30. Integration Time : 8.053 Sec 31. No of Antennas Working(Fringing) at the beginning :29 32. Name of Non-Working Antennas (with reason for each) : C13 : Servo problem 33. Note for Backup : 34. Start and End Time of Obs.(IST): 04 Dec 2017 04:00:00 - 04 Dec 2017 15:00:00 35. ONLINE Machine : Lenyadri 36. No of Antennas Working(Fringing) at the end :27 37. Comments (During Observations) : 04:00 : Started scan on 3C147. 04:15 : Stopped scan. 04:26 : Started command file. '/odisk/gtac/cmd/33_023/04dec17/obs_block7.cmd' 06:47 : S04 applied brakes. 09:10 : W05 taken for painting. 09:19 : E06 taken for mechanical work. 13:43 : S04 started working and taken for observation. 14:27 : Stopped command file. 14:28 : Started scan on 3C286. 14:36 : Stopped scan and observation session is over.