Results
of Weekly PMQC tests for GTAC31
The results of weekly Post Maintenance Quality Checks (PMQC) are kept here. The 30to1 deflection values
at the IF output and plots, pointing plots and offset values and sensitivity
measurements at the correlator output will be made available. In addition,
if other tests such as the Front End terminated test to look for spurious spikes, polarization
isolation, Tsys measurements will also be put as and when the tests are done.
PMQC Results of 23rd February 2017 at 325MHz
PMQC Results of 16th February 2017 at L-Band
PMQC Results of 09th February 2017 at 610MHz
PMQC Results of 19th January 2017 at 610/235MHz
PMQC Results of 12th January 2017 at L-Band
PMQC Results of 05th January 2017 at 325MHz
PMQC Results of 22nd December 2016 at 325MHz
PMQC Results of 15th December 2016 at 610/235MHz
PMQC Results of 01st December 2016 at L-Band
PMQC Results of 24th November 2016 at 150MHz
Pre-GTAC31 Tests